Sherwood Highway 99W Pedestrian Bridge, OR
Supported a safer way for people biking and walking to cross Oregon 99W with a new overcrossing
Quick Facts
Connects the City’s existing bike and pedestrian infrastructure to the future Sherwood West development
Decorative illumination promotes safety and color-changing designs for all seasons
Results
Created community connectivity between the existing residential neighborhoods and the newly constructed high school for future development to expand the City
Project focused on enhancing Sherwood’s identity and providing a signature doorway along the highway
Our Work
Developed the temporary traffic control plans to allow off-site bridge structures to be moved into place over the highway and surrounding roadways
Ensured pedestrian connectivity throughout construction
Provided electrical and lighting design on the bridge and the roadway below the bridge’s footprint

